No | Nama Peserta | K | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. DIMIANO KONSULTAN - 02.558.462.4-216.000 | 85,73 | Rp. 95.590.000,00 |
Rp. 95.590.000,00 |
||||||||
2 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 | 77,35 | Rp. 85.220.300,00 |
Rp. 85.220.300,00 |
Tidak lulus Nilai Ambang Batas Yang Disyaratkan | |||||||
3 | PT. MULTI KARYA INTERPLAN KONSULTAN - 02.668.150.2-201.000 | 77,85 | Rp. 87.600.000,00 |
Rp. 87.600.000,00 |
Tidak lulus Nilai Ambang Batas Yang Disyaratkan | |||||||
4 | CV. WIRA ANDRINUGRAHA - 02.075.377.8-211.000 | |
|
|||||||||
5 | CV.ANDALAS CONSULINDO - 03.254.282.1-203.000 | |
|
|||||||||
6 | CV. BUHARA PERSADA - 31.664.998.7-216.000 | |
|
|||||||||
7 | CV. ROKAN JAYA - 02.031.557.8-216.000 | |
|
|||||||||
8 | CV. Yagana Consulindo - 66.270.487.3-216.000 | |
|
|||||||||
9 | CV. INDONESIA MAJU BERSAMA - 66.229.126.9-216.000 | |
|
|||||||||
10 | AZKARADIPTA ENGINEERING CONSULTANT - 72.061.726.5-216.000 | |
|
|||||||||
11 | PT.MULTI GUNA ENGINEERING KONSULTAN - 01.521.375.4-201.000 | |
|
|||||||||
12 | CV.TUAH INDRAPURA BERLIAN - 66.086.964.5-222.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak